In short

A pivot door is a leaf that turns on a vertical axis set in from its edge, carried by a floor pivot set, a ceiling pivot or a pair of them, rather than by hinges fixed to a jamb. A hidden door is a leaf on a frame built into the wall and plastered or panelled over, so that door and wall read as one plane.

Both are sold as leaves and installed as assemblies. The pivot set is rated in kilograms, the frame is ordered to a finished wall thickness, and the floor box is set before the screed is poured. A buyer who prices the leaf and leaves the rest to site buys the most forgiving half of the product and the least forgiving half of the installation.

01A pivot door is a mechanism with a leaf attached

A hinged door gives its weight to three hinges and, through them, to a jamb in the wall. A pivot door gives the same weight to one floor set and, where fitted, a top pivot. Because the axis sits in from the closing edge the lever is longer, and the risk moves to the floor and the structure above.

So the first number is leaf mass in kilograms, not leaf width. Mass is arithmetic: a 2,100 × 900 mm leaf at 44 mm in a timber core of about 700 kg/m³ is 0.083 m³, or 58 kg. The same leaf in 10 mm toughened glass, at 25 kg/m², carries 47 kg of glass before the frame.

How each configuration carries the leaf, and what it needs from the building. Mass reference: the 58 kg leaf above.
Configuration Mass carried by What must be built Failure it produces Line for the RFQ
Floor pivot onlyFloor set in slabCast-in box before screedPlate stands proudFloor level in millimetres
Top pivot or ceiling trackStructure above headHeadrail fixed to soffitTrack settles; edge dropsFixing and design pull-out
Concealed hinges on plaster-in frameFrame, then wallFrame matched to wallShadow gap variesCover width and adjustment
Pocket door in cavityHead track, floor guideCassette sized to studWall bulges; leaf rubsCassette against stud depth

Decision rule: compare the pivot's rated leaf mass with the calculated mass plus handle, lock and closer. An 80 kg set under a 58 kg leaf carries 22 kg of fittings; a 60 kg set carries none, and the bearing takes the difference every time the door is shut. The RFQ states leaf mass, pivot model and axis position.

02The floor drawing comes before the door drawing

Agree the floor build-up and the pivot recess while the screed is open, because a floor pivot sits below the finished floor and cannot be moved afterwards. A 20 mm stone finish on a 5 mm adhesive bed raises the level by 25 mm; without that allowance the cover plate stands proud or the leaf fouls the floor.

The fixing decides which version of the detail is possible. A box cast into the structural slab does not depend on the finish; a floating screed moves, and a plate resin-anchored through the finish is only as good as the anchor and the day it was set.

Decision rule: issue the floor setting-out in the same instruction as the door order, name the trade that sets the box, and hold the order until the finished floor level is confirmed in millimetres.

Catalogue reference: interior doors and door sets in the catalogue — models, dimensions and finishes for the directions discussed above.

03A ceiling track carries the leaf, not the ceiling

Fix a top-hung leaf to structure — a concrete soffit, a steel beam or a headrail designed for the load — and never to a suspended ceiling, which carries plasterboard, light fittings and at a push a diffuser, not a 58 kg leaf.

The failure is slow and then expensive. The track settles a few millimetres, the free edge drops, the leaf catches on the floor guide, the pocket mouth cracks, and the ceiling has to come down to reach the fixings.

Decision rule: name the fixing type, the design pull-out, the access opening size and position, and the sequence — track first, ceiling second.

04A hidden door is a frame built into the wall

Order the frame to the finished wall thickness, not to the structural opening, and check the adjustment range before the plasterer arrives. A 100 mm stud partition with 12.5 mm board each side and a 3 mm skim finishes at 128 mm; a frame with 130 mm cover sits over that wall and is skimmed in, while a 110 mm frame needs 9 mm of packing each side — and that packing is where the reveal goes out of plumb.

The shadow gap is the second number. Drawn at 3 mm, it is the first thing to fail when the opening is not plumb: 3 mm at the head reads as 8 mm at the hinge side, and filler cannot disguise a varying line.

Decision rule: the RFQ states finished wall thickness, cover width, adjustment range, shadow gap and leaf thickness, and names the trade that makes good the plaster.

05Fire and smoke are certified as a set

A fire door is a doorset, not a leaf. EN 1634-1 tests an assembly — leaf, frame, intumescent seals, hinges or pivot, closer and hardware — and reports a field of application naming the sizes, frame and components tested. A leaf alone has no rating, whatever its data sheet says.

Intumescent seals expand under heat and close the leaf-to-frame gap; smoke seals are separate, and they are what a smoke-control application asks for. A doorset can have one without the other, and the certificate says which.

What a fire certificate must name. Ratings are minutes of integrity (E) or of integrity and insulation (EI).
Component Role in the test What the certificate must state
LeafTested size and coreThickness, core, maximum size
Frame or liningHolds leaf and sealsSection, cover width, wall fixing
Intumescent sealCloses the gap under heatPosition, size, number
Hinge or pivotCarries the leafModel, number, fixing
Closer and cut-outsClosing, letter plate, glazingTested models and sizes

A certificate that names the leaf and not the pivot is evidence for a different door.

Substitution is where the rating is lost: a tested hinged doorset does not become a tested pivot doorset because the leaf matches, and a cut-out made on site leaves the field of application unless the report covers it.

Security follows the same rule: PAS 24 in the UK or an EN 1627 RC class describes a doorset with its cylinder, lock points and glazing, not a leaf with a lock in it.

06Sound: Rw is a laboratory number, DnT,w is your room

Specify DnT,w where the room matters, because Rw measured to ISO 717-1 describes a specimen in a test frame while DnT,w describes the door in your wall, with your joints, seals and letter plate.

The core sets the starting point and the air decides the result. A solid-core leaf uses a timber or composite core and a hollow-core leaf a honeycomb or cardboard core, which is why they sound different when tapped; neither stops sound at a gap.

Open area is the number to calculate. A 10 mm undercut across a 900 mm leaf is 9,000 mm² of opening; a 300 × 70 mm letter plate is 21,000 mm², more than twice that, before flap tolerances.

Decision rule: the RFQ carries Rw and DnT,w with the standard, the undercut in millimetres and whether a letter plate is included.

07Schedule the opening, then choose the finish that hides it

Sizes are nominal and market-specific. US sizes are quoted in inches, UK sizes in millimetres inherited from imperial leaves, EU sizes on a metric module. None describes the hole in the wall, and that hole is what the frame, the plaster and the pivot must agree with.

Nominal leaf widths by market, and the dimension that belongs on the schedule. Nominal sizes are not millimetre-exact.
Market Nominal leaf widths Where the size comes from What to schedule
US30, 32, 36 in (762, 813, 914 mm)Nominal imperial, convertedOpening in millimetres
UK762 or 838 mmImperial-derived metricOpening and wall thickness
EU800 or 900 mmMetric moduleModule, cover width, floor level

The finish is the last decision and the one that shows. 3D textile wallcoverings are specified by roll width and pattern repeat, and the wall behind them must be flat and primed. Fluted and slat panels come in MDF, solid timber, aluminium or PET, and the substrate changes the fixing and the fire class.

On a hidden door the finish crosses the joint between leaf and wall, which makes the set-out a door decision. The pattern runs from the door centreline, the panel module lands on the door edge, and the shadow gap reads as a line. If the repeat does not divide, move the door.

Decision rule: draw the elevation at 1:5 with the door edge, shadow gap and pattern set-out on one sheet before ordering. The RFQ carries roll width, pattern repeat, panel module, substrate, fire class to EN 13501-1, and that drawing.

What your RFQ should state

  1. Leaf construction, thickness and mass in kilograms, with glass and hardware in the total.
  2. Pivot model, rated leaf mass, axis position from the closing edge, and the floor recess drawing.
  3. Finished floor level and build-up in millimetres, on the pivot setting-out drawing.
  4. For a top-hung leaf: fixing to structural soffit, design pull-out, access opening position.
  5. Finished wall thickness, frame cover width, adjustment range, and who makes good the plaster.
  6. Fire: certificate number, field of application, and confirmation that pivot, seals, closer and hardware are tested.
  7. Sound: Rw or DnT,w with the standard, the undercut, the drop seal, and any letter plate.
  8. Wall finish: roll width, pattern repeat, panel module, fire class to EN 13501-1, set-out drawing.

Where this guidance stops

Questions buyers ask

What is a pivot door?

A pivot door turns on a vertical axis set in from its edge, carried by a floor pivot set, a ceiling pivot or both, rather than by hinges on a jamb. The axis position and the leaf mass define it. Because the load goes into a small floor plate, the floor and structure above matter more than the wall.

Can a pivot door be fire-rated?

Only as part of a tested doorset. EN 1634-1 tests the leaf, frame, seals, hinges or pivot and hardware together, and the report names the components in the furnace. A pivot is not automatically covered by a report written for a hinged set. Ask for the certificate number, the field of application and confirmation that your pivot is included.

How heavy is a pivot door?

Mass is arithmetic, not a catalogue figure. A 2,100 × 900 mm leaf at 44 mm with a timber core of about 700 kg/m³ weighs roughly 58 kg. The same leaf in 10 mm toughened glass carries about 47 kg of glass plus frame. Add handle, lock and closer, then compare with the pivot's rated leaf mass.

Do hidden doors need a special frame?

Yes. A concealed door needs a frame with cover legs that meet the plaster, a rebate for the leaf and an adjustment range for the plaster thickness. It is ordered to the finished wall thickness, not the structural opening. A standard lining with an architrave will not give a flush face, and packing a small frame out is where the reveal goes out of plumb.

How do I stop sound leaking under a concealed door?

Close the gap and measure what is left. A 10 mm undercut on a 900 mm leaf is 9,000 mm² of opening, and a 300 × 70 mm letter plate is 21,000 mm². Fit a drop seal and a perimeter seal, leave the letter plate out, and ask for DnT,w rather than Rw if the room must meet a target on site.

What size opening should go on the schedule?

The opening in millimetres, not the leaf size. US nominal sizes are 30, 32 and 36 in, UK sizes are 762 and 838 mm, and EU sizes are 800 and 900 mm. Schedule the structural opening, the wall thickness, the floor level and the axis position.

Does a concealed door need a closer?

If it is a fire door, yes: the closer is part of the tested set, and a concealed closer must be the one named in the certificate. On a non-fire door a closer is optional, but a flush leaf with no visible handle needs a push plate or concealed pull, and the catch is chosen for that leaf.

Sources

  1. EN 1634-1 — Fire resistance and smoke control tests for door and shutter assemblies — European Committee for Standardization
  2. EN 13501-1 — Fire classification of construction products and building elements — European Committee for Standardization
  3. ISO 717-1 — Acoustics: rating of sound insulation in buildings and of building elements — International Organization for Standardization
  4. EN 1627 — Pedestrian doorsets, windows, curtain walling, grilles and shutters: burglar resistance — European Committee for Standardization
  5. PAS 24 — Enhanced security performance requirements for doorsets and windows — British Standards Institution
  6. Approved Document B — Fire safety: volumes 1 and 2 — UK Ministry of Housing, Communities and Local Government
  7. Construction Products Regulation — declaration of performance — European Commission

Pages related to this guide

How this guide was checked

FS

Foshan Supply editorial team · Catalogue indexMethodology

Written in Foshan and reviewed against the catalogue and public standards on 2026-11-05. This page is a buying guide, not a quotation or a warranty. How we work.

How to cite this page: Foshan Supply, “Pivot doors and hidden doors: the frame is the product”, 2026-11-05, https://foshansupply.com/blog/pivot-hidden-doors/