In short
- A 40HQ is rated 76.4 m³ but loads about 65–68 m³; a 20GP rated 33.2 m³ loads about 28 m³. The difference is packing loss, not a supplier error.
- Packed density picks the box. Under about 400 kg/m³ a 40HQ runs out of volume first; above about 1,000 kg/m³ both boxes run out of payload first.
- The last metre at the door is the constraint: the aperture is smaller than the box, so a crate that fits inside may not fit through the opening.
A container loading plan is a bay-by-bay drawing of what goes into a box, in which order, at what mass and stack height, checked against the internal dimensions of the allocated container and the road limit at the other end. The 40HQ container dimensions that matter are not the brochure figures: they are the space you can reach, the aperture you must pass and the payload left after the tare.
That distinction decides what you buy. A supplier who quotes one 40HQ has priced a container, not a load. If the cargo cubes out at 60 m³ or weights out at 24 t, the gap becomes a second shipment or a repack, settled weeks before the vessel sails.
0176.4 m³ is a brochure figure and 65–68 m³ is the load
A 40HQ is rated at 76.4 m³ and loads about 65–68 m³; a 20GP is rated at 33.2 m³ and loads about 28 m³. One cubic metre in seven is lost before a carton is refused, and the loss is structural: the door bay, the roof lip, the gaps around pallets and the space no forklift can reach.
| Measure | 20GP | 40HQ | What it decides |
|---|---|---|---|
| Nominal volume | 33.2 m³ | 76.4 m³ | The freight quote figure |
| Practical usable | About 28 m³ | 65–68 m³ | What the packing list must fit |
| Planning loss | About 16% | About 14% | Void fill and door bay |
| Floor length | About 5.9 m | About 12 m | Bays you can draw |
| Floor area at 2.3 m | About 13.5 m² | About 27.5 m² | Mass per square metre |
| Payload | About 28 t | 26–28 t | Mass the road also carries |
| Floor load when full | About 2 t/m² | About 1 t/m² | Risk of a crushed panel |
t = metric tonne. Floor area assumes 2.3 m clear internal width. Confirm payload, tare and dimensions on the allocated box's plate.
The ratio is worth memorising. A 40HQ is 2.3 times the nominal volume of a 20GP but about twice the floor area, because the extra capacity is height. Payload barely moves: two 20GPs carry about 56 m³ and up to 56 t, one 40HQ about 66 m³ and 27 t.
Decision rule: convert the order into packed cubic metres and packed tonnes before asking for a rate. If the two numbers point at different boxes, the cargo is the tie-breaker.
02Packed density decides the box before the rate does
Payload divided by usable volume gives the density at which a box stops being a volume purchase: about 28,000 kg ÷ 28 m³ = 1,000 kg/m³ for a 20GP, and about 27,000 kg ÷ 66 m³ = 409 kg/m³ for a 40HQ.
Furniture rarely comes near either figure. A cartoned outdoor lounge set, frames nested and cushions compressed, is mostly air: at an assumed 180 kg/m³ a 40HQ reaches about 11.9 t, less than half its payload.
| Packed density | 20GP | 40HQ | What to specify |
|---|---|---|---|
| Under 400 kg/m³ | Volume binds | Volume binds | One 40HQ; stack to the roof |
| 400–1,000 kg/m³ | Payload binds | Volume binds | 40HQ still wins on volume |
| Over 1,000 kg/m³ | Payload binds | Payload binds | Two 20GPs carry twice the mass |
Density comes from the packing list: packed volume and gross mass, not catalogue size.
Under 400 kg/m³ the roof is the constraint, so stack to within 50 mm of the ceiling. Between 400 and 1,000 kg/m³ the 40HQ still gives more volume, but every extra layer must earn its mass. Above 1,000 kg/m³ both boxes run out of mass before space.
Catalogue reference: how consolidation and shipping are coordinated — models, dimensions and finishes for the directions discussed above.
03The last metre is loaded first and it is the tightest
The door aperture is the smallest rectangle in the sequence and it sits at the end of it. A crate designed against internal height can be too tall for the opening by more than the clearance allowed, and the error appears when the box is already on the chassis.
Design every crate to the internal dimensions minus 100 mm on all three axes, then check it against the aperture as a separate rectangle. Two boxes of the same nominal size are not identical, and the difference shows at the door, where the lining, locking bars and sill intrude.
- Measure the packed crate, not the product: length × width × height in millimetres and gross mass in kilograms.
- Draw the floor in bays of about 1.2 m from nose to door, and give every crate a bay and a stack height.
- Load the densest crates first, at the nose, so light and bulky goods finish at the door where they can still move.
- Fill the full width of each bay and tie the stack to the lashing points; block stowage leaves no void.
- Keep the door bay for what must come out first at destination, and for the dunnage that closes the gap.
- Photograph each bay before the next is built, record the seal number and send the set with the VGM.
Order matters more than the drawing: loading from the nose leaves the door bay free to rearrange. A pallet truck needs room to turn, so a 1.2 m crate cannot be pushed into a 1 m gap; the last bay is hand-loaded or left for dunnage.
Decision rule: if a crate cannot be described by bay position, footprint and stack height, it has not been planned.
04Mass sits on the floor first and on the axles second
A full 20GP puts about 2 t on every square metre of floor and a full 40HQ about 1 t. Those are averages. A crate on four 100 mm feet concentrates the same mass on a fraction of that area, and a container floor is a sandwich panel: crush the core and it takes water.
On the road the question changes. Container payload is an ocean figure; the collecting vehicle has a gross weight limit, an axle configuration and, on some routes, a permit. A 40 ft box on a skeletal trailer divides its mass between the tractor drive axle and the trailer axles.
Decision rule: give the haulier the packed gross mass and the bay plan, and ask for the mass per axle on the loaded vehicle. A container that is legal at sea can be illegal forty kilometres from the port.
05VGM, ISPM 15 and the codes that stop a container
Three documents stop more containers than packing errors do: a missing verified gross mass, an unmarked timber crate and a tariff code that does not match the goods.
SOLAS requires a verified gross mass for every packed container before loading. Weigh the packed container, or add the certified mass of every package to the tare. The result is one figure in kilograms, signed by the shipper and submitted before the carrier cut-off: not a range, not the supplier estimate.
ISPM 15 covers solid wood packing: crates, pallets, dunnage. The mark goes on the wood itself, not on a label. Plywood, MDF and OSB are processed panels, so a plywood case on solid wood skids needs the mark on the skids.
Duty depends on the HTS classification, and Section 301 tariffs on many Chinese-origin goods are additional to the MFN rate. The code belongs on the commercial invoice before booking, because it also decides whether an import licence, a CE declaration or a timber due-diligence statement is needed. EUDR covers relevant timber and wood products, with an application date that depends on operator size. For windows and doors, EN 14351-1 puts the CE declaration on the manufacturer.
- Commercial invoice with the HTS code per item and the named port: purchasing or the forwarder.
- Packing list with carton dimensions in millimetres, gross mass in kilograms and carton numbers: the supplier.
- VGM in kilograms, with the method and the signatory: the shipper.
- ISPM 15 mark photographed on every solid wood crate, pallet and dunnage piece: the packer.
- Test reports and declarations the destination requires: the manufacturer.
Decision rule: list every document with the party who produces it and the date it is due. A document with no owner is a delay with a tracking number.
06A loading plan is a bay schedule, not a conversation
A plan that cannot be handed to a loader who does not share your language is not a plan. Six fields per bay are enough to build the load and to check it afterwards.
| Field | Unit | Example entry | Why it is there |
|---|---|---|---|
| Bay number | none | 1 at the nose to 6 at the door | Matches the photograph set |
| Item and carton range | none | Lounger frame, cartons 1–14 | Ties the bay to the packing list |
| Packed size | mm | 1,650 × 780 × 420 | Fits the aperture and the bay |
| Gross mass | kg | 38 per carton | Sets the stack and the axle sum |
| Stack height | mm | Two high, 840 total | Clears the roof and the door |
| Lashing | none | Two straps to the floor rings | Stops movement in a seaway |
The example is a format, not a product specification. Fill it from your packing list and the allocated container.
The plan is signed twice, by the packer and by the loader, and the signed copy travels with the packing list and the photographs.
Decision rule: if a bay cannot be described in the table above, the packing is not decided yet.
07Where the plan and the box disagree, and the clause that covers it
The expensive loading problem is the one found at the gate, with the container on the chassis and the cut-off hours away.
- A crate that fits the box but not the aperture, measured against internal height.
- A short-load of 2–3 m³ found after the doors close: the list said 66 m³ and the box took 63.
- A VGM below the declared mass because one pallet stayed in the yard.
- A wet interior or a damaged floor found after loading, when the survey belonged before the first crate went in.
- A seal number that does not match the documents, which turns a clean container into a claim.
The clause that covers most of it is a notice obligation. Write into the purchase order that the supplier confirms packed volume and gross mass in writing before booking, and notifies you if either changes by more than 5% before the box is stuffed.
The photographs are the other half: the floor before the first crate, each completed bay, the last bay before the doors close, and the seal on a closed door.
Decision rule: no container is booked until packed volume, packed mass and container size sit on one page agreed by both sides.
What your RFQ should state
- Packed dimensions in millimetres and gross mass in kilograms for every carton and crate, not the assembled product.
- The container size, the internal dimensions of the allocated box and the door aperture, confirmed before packing.
- The bay schedule: bay number, item, carton range, stack height and lashing method.
- Packed density in kilograms per cubic metre, so the box can be checked against the payload.
- Who weighs the packed container, by which VGM method, and the deadline for submitting the figure.
- ISPM 15 treatment and the mark on every solid wood crate, pallet and dunnage piece, photographed.
- The HTS code per item, a note on whether Section 301 applies, and the documents that follow from it.
- The notice clause: who tells whom if packed volume or mass changes by more than 5%, and by when.
Where this guidance stops
- Internal dimensions vary between containers of the same nominal size and between lessors. Treat every figure here as a planning reference until you hold the allocated box and its plate.
- The usable volumes are ranges for standard boxes. A container with a damaged lining, a wet floor or a modified roof loads differently, and the survey belongs before loading.
- This article does not quote freight rates. Container cost moves with route, season, carrier and equipment availability.
- Road limits, axle rules and permits are local. Only the haulier and the destination authority can confirm what is legal on a given route.
- Duty, admissibility and product compliance depend on the HTS code and the destination. Foshan Supply coordinates sourcing, inspection and shipping information; we do not classify goods, act as a customs broker, weigh containers, issue a VGM or certify a product.
Questions buyers ask
What are the internal dimensions of a 40HQ container?
A 40HQ is rated 76.4 m³ nominal and about 65–68 m³ usable. Internal length, width and height vary by manufacturer, so design against the allocated container and its plate. Check the door aperture separately: it is smaller than the internal section, and that is where oversized crates fail.
How many tonnes can a 40HQ carry?
About 26–28 t of payload, depending on the tare on the safety approval plate and the road limit at destination. The ocean figure is not the road figure. A 40 ft box on a trailer spreads mass across tractor and trailer axles, and some routes cap gross weight lower.
Is a 40HQ always better than a 20GP?
No. A 40HQ gives 2.3 times the nominal volume but about twice the floor area and roughly the same payload. Above about 1,000 kg/m³ packed density, two 20GPs carry twice the mass. Below about 400 kg/m³, such as cartoned furniture, the 40HQ is the box that uses the freight.
Why is usable volume lower than nominal volume?
The last metre at the door cannot be stacked to the roof, the lining takes space, crates do not tessellate, and some voids need dunnage. The gap is about 16% on a 20GP and about 14% on a 40HQ. Plan to the usable figure and treat nominal as a label.
What is a VGM and who provides it?
A verified gross mass is the packed container total mass, required by SOLAS before loading. The shipper provides it, by weighing the packed container or by adding certified package masses to the tare. It is one signed figure in kilograms, submitted before the carrier cut-off.
Does ISPM 15 apply to a plywood crate?
Plywood, MDF and OSB are processed panels and generally fall outside ISPM 15, which covers solid wood packing such as crates, pallets and dunnage. A plywood case on solid wood skids is only half covered: the skids need treatment and the IPPC mark.
How do I stop cargo moving inside a container?
Fill each bay to the full width and height, tie stacks to the lashing points and close the final gap with dunnage rather than leaving it empty. Block stowage does more than any single strap. Photograph each bay as it is completed, because a claim is decided by the loading record.
Sources
- SOLAS and the verification of the gross mass of packed containers — International Maritime Organization
- Incoterms 2020 rules — International Chamber of Commerce
- ISPM 15: regulation of wood packaging material in international trade — International Plant Protection Convention
- Harmonized Tariff Schedule of the United States — US International Trade Commission
- Regulation on deforestation-free products (EUDR) — European Commission
- US Customs and Border Protection: importing and entry — US Customs and Border Protection
Pages related to this guide
How this guide was checked
- Written from the public catalogue, the standards and regulator pages listed under Sources, and the process records described on the services page.
- Catalogue references and model details were checked on 2026-11-05; 6 primary sources are linked above.
- No supplier paid for placement. No price on this page is an offer; ranges are planning references and must be confirmed in a quotation.
How these guides are researched and reviewed · Corrections policy