In short

Bathroom waterproofing is the continuous layer between substrate and tile — a liquid coating, a bonded sheet, or a formed tray with an upstand — that keeps water out of the structure. In Europe, liquid products beneath ceramic tiling are covered by EN 14891, which sets out how a membrane is tested, not how a bathroom is built.

That distinction matters at quotation stage. The membrane is invisible at handover, and it decides whether a leak in eighteen months is a tiling defect or a waterproofing failure. Two quotes can name the same tile, adhesive and grout and still describe different assemblies; the difference sits in the fall, the tape and who owns the junction.

01A membrane is a system, not a roll of material

A membrane is sold as one product and installed as a set. The primer bonds to the substrate, the tape bridges the internal corners, the collar seals the outlet, and the tray upstand or threshold finishes the edge. Remove one item and the declared performance no longer describes what is installed.

The standard to quote for a liquid product is EN 14891, which covers water-impermeable coatings used beneath ceramic tiling bonded with adhesives. A declaration of performance under it shows the product was tested for watertightness, crack bridging and adhesion. It does not show that the maker's tape was used, or that the coats reached the declared dry-film thickness. Dry-film thickness is the number to hold; a wet coat thickness says nothing without the solids content.

Decision rule: if a quote names a membrane but not the tape, primer, corners and collar from the same maker, treat the system as undeclared and ask for the accessories list before comparing price.

02Four ways to tank a shower, and what each one hides

The method matters less than the joint it creates. Each of the four common assemblies fails somewhere different, and the quote rarely says which one you are buying.

Four wet-room assemblies compared by build-up, first failure point and the evidence to request. Build figures are planning references; the maker's declared data governs.
Assembly Nominal build Fails first at Evidence to request
Liquid-applied, cementitiousTwo or more coats; dry film typically under 1 mmInternal corners and the outlet collarEN 14891 declaration; accessories list; coat-by-coat photographs
Liquid-applied, dispersion (acrylic or polyurethane)Declared dry film, typically 0.5–1.5 mmAdhesion to a dusty, painted or damp substratePrimer specification; substrate moisture reading; adhesion test
Bonded sheet, polyethylene or PVCSheet 0.4–1.5 mm plus adhesiveLap joints and the drain flangeLap width in millimetres; flange compatibility; seam method
Formed tray with tiling upstandUpstand typically 40 mm above the screedWhere the wall membrane laps the upstandTray standard (EN 14527); upstand height; lap detail

Nominal values are planning references, not product data. Confirm the sheet or dry-film thickness declared for the product supplied.

Read the table as a list of questions, not a ranking. The same coating on a masonry screed and on a timber floor is one product with two outcomes.

Decision rule: on a timber floor, choose an assembly that accommodates movement — a bonded sheet or a formed tray — and keep liquid coatings for stable concrete or masonry.

Catalogue reference: bathroom vanities built for wet rooms — models, dimensions and finishes for the directions discussed above.

03The fall belongs on the drawing, as a ratio

The fall to the drain is formed in the screed, not in the adhesive. When it is formed in the bed, the adhesive thickness varies across the floor, the tiles follow the slope in steps, and the thin end is where the bond fails first.

Fall as a ratio, converted to millimetres per metre and to total drop across two shower widths. Arithmetic only; the project drawing sets the requirement.
Fall mm per metre Drop over 900 mm Drop over 1,200 mm
1:100109 mm12 mm
1:8012.511 mm15 mm
1:6016.715 mm20 mm
1:502018 mm24 mm
1:402522 mm30 mm

Drops rounded to the nearest millimetre. Confirm the fall the membrane maker and the project's tiling standard require for the outlet type.

The outlet type changes the geometry. A point drain needs four planes falling to one centre, and the hip lines where they meet are the hardest part of the floor to tile. A linear drain needs one plane: easier to lay, harder to set out, because the whole floor tilts and the threshold absorbs the difference.

Decision rule: if a drawing says 'fall to drain' without a ratio, do not price the tiling. Ask for the ratio, the outlet position and the finished level at the door; those three numbers decide the screed, the tile size and the threshold.

04Corners, outlets and fixings are where it leaks

Water does not cross a membrane; it finds the edge of one. The internal corner comes first, because two planes meet there and the substrate can move in two directions. Tape bedded in the first coat and covered by the second is the detail; a bead of sealant is a maintenance item. Grout is a joint filler to EN 13888, not a waterproof layer.

The outlet comes second. A clamping-flange drain traps the membrane between two rings and seals on the flange; a drain with only a screw-on grate gives a sheet nothing to clamp and a coating a plastic face to bond to. Ask which drain is on the drawing, because the answer can rule out one of the four assemblies above.

Every penetration is a hole in the tanking. A shower valve, a screen hinge, a vanity bracket and a towel rail each fix through the layer, and each seal should come from the maker's range.

Decision rule: schedule every fixing inside the wet zone before first fix, and require the maker's collar for each type. Written after tiling, the schedule is a list of holes.

05The substrate can fail the membrane before the tile does

Every membrane is tested on a substrate, and the test does not travel. A coating on a dusty skim, a sheet on damp screed, or a liquid product over painted plaster will delaminate whatever its declaration says.

Two readings belong in the handover file. The first is substrate moisture: a cement screed is commonly accepted at around 2% CM or less before a membrane goes on, a site benchmark rather than a standard, and the maker's figure overrides it. The second is flatness, because a hollow under a sheet becomes a void that water reaches and a foot feels.

Timber needs its own number. A tiled floor on a timber deck is usually detailed for deflection no greater than L/360 under load; beyond that the membrane stretches, the grout cracks and the joint opens. That is an engineer's figure, not a supplier's.

Moisture-resistant plasterboard is a substrate, not a waterproofing. Inside a shower the membrane keeps the board dry, and a paper face is a poor key for a coating once wet. A wet-area backer board is the more honest base, and its joints still need taping.

Decision rule: if the wall inside the shower is plasterboard, replace it with a wet-area backer board or state in the file that the membrane is the only line of defence. Do not let 'moisture-resistant' stand in for tanking.

06The rest of the room makes claims of its own

Waterproofing is decided with the fittings, because the fittings pierce it. A wall-hung vanity transfers the cabinet, the basin, the water and a person leaning on the front edge into the wall, so the blocking must be designed for that load and fixed before the membrane. Bolting a cabinet through finished tanking is a leak with a warranty argument attached.

The fittings carry their own standards: washbasins to EN 14688, shower trays to EN 14527, enclosures to EN 14428 and mixers to EN 817. Toughened shower glass is specified under EN 12150, with laminated glass under EN ISO 12543 where a project calls for it. Glass thickness is declared on the enclosure's test evidence, commonly 8 mm for a hinged door, and the hinge and seal decide whether water leaves the enclosure.

Extraction is the part buyers leave out. A fan is rated in litres per second at a pressure, and a long flexible duct, a tight bend or a door with no undercut reduce what it can move. Ask for the duct route, its equivalent length and the undercut in millimetres.

Finishes behave differently for the same reason. Chrome plating, PVD, powder coating and lacquer differ in hardness and colour range, and PVD is the harder with fewer colours. None is scratch-proof, and a claim that one is should be read as marketing.

Decision rule: put the fan duty, the duct route and the undercut in the same schedule as the tiling and the tanking. Otherwise the room can be waterproof and still damp.

07Test it wet, then photograph it

The only test a buyer can witness before the tile goes on is a flood test. It takes an afternoon and answers the one question the finished floor hides.

  1. Plug the outlet and seal it against the membrane, not against the tile adhesive.
  2. Flood the floor to a depth that covers the highest point of the fall, and mark the water level on the wall.
  3. Leave it for 24 hours, with the room below and the walls either side accessible for inspection.
  4. Check the marked level for loss, then inspect the ceiling below, the adjacent skirting and any wall on the far side of the wet zone.
  5. Photograph the level, the date and the inspection, and have the result signed before the first tile is laid.

The paper that goes with it is short: data sheet and declaration, accessories used, coat or sheet records, the test result with a date, and photographs. On a multi-room project, keep one file per wet room, numbered to the drawing.

Read the warranty the same way. Most membrane warranties exclude movement, chemical cleaning and damage at fixings, which are the three things that happen. Ask what is excluded in writing, who inspects, and who pays if a test fails after the tile is laid.

Decision rule: no flood test, no tiling. Put that sentence in the order with the date the test is witnessed and the name of the person signing it off.

What your RFQ should state

  1. Membrane, primer, tape, pre-formed corners and outlet collar supplied as one maker's system, with the declaration of performance to EN 14891.
  2. The fall as a ratio and the drop in millimetres at the drain, the door threshold and the furthest corner, with a screed level schedule.
  3. The outlet type named, with written confirmation that it has a clamping flange compatible with the membrane specified.
  4. Substrate named and prepared: backer board or screed, moisture reading and method, flatness tolerance, primer and curing time.
  5. Every penetration in the wet zone listed — valve, screen hinge, vanity bracket, towel rail — with the maker's sealing detail.
  6. Coat records: number of coats, declared dry-film or sheet thickness, ambient temperature and drying time between coats.
  7. Flood test of 24 hours, witnessed and photographed before tiling, with the result and signature in the handover file.
  8. Warranty exclusions in writing, including movement, cleaning chemicals and damage at fixings, and the inspection route if a test fails.

Where this guidance stops

Questions buyers ask

What fall should a shower floor have?

The fall should be stated as a ratio on the drawing, typically between 1:80 and 1:50 for a tiled shower, so the drop is measurable. At 1:80 a 1,200 mm wide shower falls 15 mm. The fall is formed in the screed, not the adhesive bed, and the outlet type and membrane maker's requirement set the final figure. Confirm both before the screed is poured.

Do I need to waterproof the whole bathroom or only the shower?

The shower is the minimum, and the whole floor is commonly tanked because water travels sideways under the tile. Walls inside the shower are commonly tanked to at least 1,800 mm above floor level, or to full height where the rose sprays above that. That height is a planning reference; local code and the membrane system set the extent.

Can I tile directly onto a waterproof backer board?

Not without treating the board as part of a system. The board is a substrate: joints, corners, screw heads and the junction to the tray all need tape and the maker's sealant, and some boards need a full coating. Ask the board maker whether joints alone are enough for the board supplied, not the range.

How do I test bathroom waterproofing before tiling?

Flood the floor with the outlet plugged, to a depth that covers the highest point of the fall, and leave it for 24 hours. Check the room below and the walls either side, then photograph the water level and the date. The test proves the floor field, not the fixings, so schedule the penetrations separately and photograph each seal before tiling.

Can a new membrane go over existing tiles?

Usually not directly. Adhesion to a glazed or contaminated tile face is poor, the added build-up changes door and tray levels, and the old substrate still moves. Removing the tile is the reliable route. If the floor cannot come up, ask the maker whether a primer and overlay system is approved for that substrate, in writing.

What does EN 14891 actually cover?

EN 14891 covers liquid-applied water-impermeable products used beneath ceramic tiling bonded with adhesives. It defines how watertightness, crack bridging and adhesion are tested. It says nothing about installation, taped corners or substrate moisture, which is why the site record matters as much as the certificate.

Is a shower tray with an upstand enough without a membrane?

No. The upstand protects one edge of the floor, and the wall above it is still tile and grout over a substrate water can reach. The junction between upstand and wall membrane is the detail that fails, so the membrane must lap over the upstand and seal to it. The tray is part of the assembly, not a substitute for tanking.

Sources

  1. EN 14891 — Liquid-applied water-impermeable products for use beneath ceramic tiling bonded with adhesives — CEN-CENELEC
  2. EN 14688 — Sanitary appliances: wash basins — European Committee for Standardization
  3. EN 14428 — Shower enclosures: functional requirements and test methods — European Committee for Standardization
  4. EN 12150 — Glass in building: thermally toughened soda lime silicate safety glass — European Committee for Standardization
  5. EN 14527 — Shower trays for domestic purposes — European Committee for Standardization
  6. EN 12004 — Adhesives for ceramic tiles: classification and requirements — CEN-CENELEC
  7. EN 13888 — Grouts for tiles: definitions and specifications — CEN-CENELEC

Pages related to this guide

How this guide was checked

FS

Foshan Supply editorial team · Catalogue indexMethodology

Written in Foshan and reviewed against the catalogue and public standards on 2026-11-05. This page is a buying guide, not a quotation or a warranty. How we work.

How to cite this page: Foshan Supply, “Bathroom waterproofing: membrane, fall and the claim”, 2026-11-05, https://foshansupply.com/blog/bathroom-waterproofing/