In short

A proforma invoice is a seller's formal offer to supply named goods on stated terms before shipment, issued so the buyer can pay a deposit, open a letter of credit or book freight. Unlike a commercial invoice, it is not a demand for payment; unlike a quotation, it is written to be accepted.

Four readers use the same page. The bank reads the beneficiary and the goods description. The forwarder reads the port, the Incoterm and the carton count. The inspector reads the specification and the sample reference. Finance reads the payment schedule and the validity date. A page that satisfies one reader and not the others is why a deposit leaves on time and the shipment does not.

01A proforma invoice is a quotation your bank will read

Four documents travel with an export order, and buyers use the words interchangeably until something goes wrong. A quotation binds nobody. A proforma invoice is a numbered, dated offer to supply on stated terms, and it is the page a bank examines to open a credit. A sales contract carries the remedies; a commercial invoice states the customs value.

In practice the proforma does the work of all four: it is quoted into a credit, attached to an import-licence application, used to book freight and handed to the forwarder as the cargo description. A vague field becomes a bank discrepancy and an inspection argument.

Four order documents compared by function and by the field that carries most risk.
Document Function Principal reader Riskiest field
QuotationPrices an option; non-bindingBuyer's budgetValidity
Proforma invoiceOffer to supply before shipmentBank, inspector, forwarderSpecification and payment schedule
Sales contractBinds both parties; sets remediesLawyer or arbitratorGoverning law and liability cap
Commercial invoiceStates value at shipmentCustoms, bankHS code and country of origin

An accepted proforma can become the contract.

Decision rule: if the page cannot open a credit and brief an inspector without a covering email, it is still a quotation.

02Write the specification so an inspector can fail it

Porcelain tile, 600 × 1,200 mm, matte is a catalogue line, not a specification. An inspector cannot pass or fail it and a factory cannot be held to it. A specification line needs the standard and grade, the dimension with its tolerance, the thickness, the finish, the shade or calibre, and the approved sample revision.

The acceptance scheme belongs on the same page. ISO 2859-1 sets out sampling by attributes; general inspection level II with an AQL of 2.5 for major defects and 4.0 for minor ones is a common starting point, but the values are a commercial choice, not a legal default. The report must name lot size, sample size, AQL values and defect classes, or it cannot be checked.

A visual inspection covers quantity, specification, workmanship, dimensions, packing and marks. It does not confirm material composition, a fire class, a slip rating or a formaldehyde grade; those need a laboratory test with its own sample and lead time. A line reading test report required, with no named standard the standard, the laboratory and who pays produces a certificate of unknown scope.

Decision rule: every specification line must end in something measurable — a millimetre, a grade, a test method or a sample revision.

Catalogue reference: sourcing and coordination services — models, dimensions and finishes for the directions discussed above.

03The deposit paragraph decides who holds the leverage

The common structure is 30% deposit and 70% before shipment by telegraphic transfer. On an order of USD 100,000 the deposit is USD 30,000 and the balance is USD 70,000; the point of the split is that the larger number stays with the buyer until there is evidence.

That leverage disappears if the balance is triggered by ready to ship. Tie it to a document: a copy of the pre-shipment inspection report against the agreed plan, a bill of lading showing the named port, or a dated loading record whose carton numbers match the packing list. On a long run, keep a retention until the last carton is loaded.

Deposit size should follow exposure, not habit. A first order with a supplier you have not visited is a different risk from a repeat order of a standard item. If the supplier asks for more, ask what the money buys: raw material, a mould or working capital.

Decision rule: every tranche needs a document, a signatory and a deadline. A schedule that says balance before shipment has none of the three.

04T/T, L/C and D/P demand different paperwork

The instrument decides how much paperwork surrounds the money. A telegraphic transfer is a bank instruction: the bank does not read the specification or refuse a payment because the cartons are wrong. A documentary credit pays against conforming documents, not conforming goods.

Payment methods compared by risk bearer, cost driver and document discipline.
Method Risk carried by Cost driver Documents Fits
T/T deposit and balanceBuyer, until releaseTransfer charges and FXLowRepeat suppliers
T/T against documentsBuyer, brieflyTransfer and courierMediumOrders with an inspection
L/C at sightBanks, subject to documentsIssuance, amendment, discrepancyHighLarge orders, new suppliers
D/P and D/ABuyer's bank holds documentsCollection charges, credit riskMediumEstablished lanes
Open accountSellerFX and reconciliationLowLong relationships

One order can use more than one method.

A letter of credit is not a quality instrument. Under UCP 600 the issuing bank has five banking days after presentation to decide whether the documents comply; a discrepancy stops the money without fixing the defect. That is why the proforma behind a credit must match the credit's wording: beneficiary name as on the bank account, goods description in the same terms, quantity tolerance, partial shipment, latest shipment date and port of loading.

Documents against payment and against acceptance work differently: the buyer's bank releases the shipping documents only on payment or on acceptance of a bill of exchange. Neither adds an inspection.

Decision rule: choose the instrument before the price, then write the proforma to match its document list.

05An Incoterm without a named place is an unfinished sentence

Incoterms 2020 allocates delivery, cost and risk at a named place. It does not transfer title, set the quality standard or decide which regulations the product must meet. The named place is the part buyers leave out: FOB is incomplete until a port is named.

For a consolidated order the term matters more than the price. A supplier delivering to a consolidator's warehouse in Foshan is not loading a vessel, so FOB does not describe the handover. FCA at the supplier's premises, with your forwarder collecting, puts the risk transfer where the cartons change hands. CIF and DAP leave import clearance with the buyer; DDP makes the seller the importer of record.

Two fields support the Incoterm: the HS code and the country of origin. The broker needs both to estimate duty, and the commercial invoice must repeat them exactly. A code invented by a salesperson, or an origin that changes between proforma and shipment, is a customs question that arrives after the goods.

Decision rule: write the term, the place and the version in one line — FCA [address], Incoterms 2020 — with the HS code and origin beneath. A line reading only FOB makes two quotes incomparable.

06Validity and the lead-time trigger

Validity is a number of days and a currency, not a feeling. A price that holds for 30 days from the invoice date is a different offer from one that holds subject to market. Write the period, the currency and the condition that voids it, and say who carries an exchange-rate movement.

Lead time needs a start event and an end event. Thirty days is unenforceable; 30 working days from receipt of the deposit and written approval of the pre-production sample, ex-works, can be checked. Thirty working days on a five-day week is about six calendar weeks before transport, and a factory counting calendar days is promising something shorter.

Ask for the production calendar in writing. Chinese New Year, National Day and the May holiday move effective capacity, and the dates change each year; a supplier who says the team works through the holiday is making a staffing claim, so ask which lines stay open. Add a delay clause with a notice period and a remedy.

Decision rule: no lead time without a trigger, a unit (working or calendar days) and an end point.

07Reconcile five documents before the balance leaves

By the time the balance is due, five documents describe one order: proforma invoice, commercial invoice, packing list, bill of lading, inspection report. Each can be right alone and wrong as a set.

Documents in one shipment compared by issuer, the field that must match and the consequence of a mismatch.
Document Issued by Must match If it does not
Proforma invoiceSellerSpecification, price, termsDeposit paid for another product
Commercial invoiceSellerProforma invoice and HS codeValuation query, duty adjustment
Packing listSeller or consolidatorCarton count, marks, item numbersShortage found at destination
Bill of ladingCarrier or forwarderShipper, consignee, port, quantityCargo released to the wrong party
Inspection reportInspectorLot size, sample size, AQL, marksReport not tied to this shipment

Photographs support the file; the fields decide the release.

  1. Check the seller's legal name on every document against the business licence.
  2. Check quantity on the proforma against the commercial invoice and the bill of lading.
  3. Check that the goods description is identical on invoice, packing list and credit.
  4. Check the Incoterm and named place against the freight booking, not the quotation.
  5. Check carton marks against the inspection photographs and the container plan.
  6. Confirm bank details by a callback to a number already on file.

Consolidation adds a layer. When several suppliers ship in one container, each proforma stands alone, the packing list maps every carton to a supplier and item, and the bill of lading may name the consolidator as shipper. Without that mapping a shortage is unattributable.

Decision rule: release the balance when the five documents agree, not when the photographs look right.

What your proforma invoice should state

  1. The seller's full legal name, registered address and unified social credit code, matching the licence and the bank account.
  2. A proforma number, issue date and validity in days, with the currency and the condition that voids the price.
  3. Each item by standard, grade, dimension with tolerance, thickness, finish, shade or calibre, and approved sample revision.
  4. The Incoterm with named place and version, plus the HS code and country of origin on every line.
  5. The payment schedule, with each tranche tied to a named document, a signatory and a deadline.
  6. Lead time in working or calendar days from receipt of deposit and approval of the pre-production sample, ex-works.
  7. Packing: carton grade, shipping marks, units per carton and a packing list mapping cartons to supplier and item.
  8. The inspection standard and sampling plan: ISO 2859-1 level II, AQL 2.5 major and 4.0 minor, or the agreed alternative.

Where this guidance stops

Questions buyers ask

What is a proforma invoice?

It is a seller's formal offer to supply named goods on stated terms before shipment, carrying a number, a date, a validity period and enough detail for a bank to open a credit and an inspector to write a scope. It is not a tax invoice and it does not transfer ownership.

Is a proforma invoice legally binding?

It can be, when it is specific enough to be accepted and the buyer accepts it in writing. A page headed quotation with no number, validity or payment terms is an invitation to treat. Where the CISG applies, a definite proposal to specific persons can form a contract on acceptance.

What is the difference between a proforma invoice and a commercial invoice?

The proforma comes before shipment and proposes the terms. The commercial invoice is raised at shipment, states the value for customs and is the document the buyer pays against. The two should agree field for field on seller, buyer, description, quantity, unit price, Incoterm and origin. Any difference is the first thing a broker will query.

Why does a bank need the proforma invoice to open a letter of credit?

The proforma is the commercial basis for the credit: it identifies the beneficiary, the goods, the quantity, the price and the shipment window. The bank turns those into credit terms and a document list. If the proforma says FOB without a port, or describes the goods differently from the credit, the documents presented later will not comply.

Should the balance be paid before or after inspection?

After, wherever the supplier will agree. Tie the balance to a copy of the inspection report against the agreed sampling plan and a copy of the bill of lading. If the supplier insists on payment before inspection, ask which document they will accept instead and write that answer into the proforma.

Can a supplier change the price after the proforma invoice is issued?

Only on the terms written on it. A validity period in days, a named currency and a stated condition for revision decide the answer. Without those three the price is open. If raw-material movement is a real risk, agree a revision mechanism with a threshold and a notice period.

Which Incoterm should a small consolidated order use?

FCA at the supplier's premises, with your forwarder collecting, usually describes a consolidated container better than FOB. The supplier hands over loaded cartons at its own gate, risk passes there, and the consolidator controls the move to the port. Name the address and the version, and keep the HS code and origin on the same page.

Sources

  1. Incoterms 2020 rules — delivery, cost and risk allocation — International Chamber of Commerce
  2. Letters of credit and UCP 600 — documentary credit rules — International Chamber of Commerce
  3. ISO 2859-1 — sampling procedures for inspection by attributes — International Organization for Standardization
  4. National Enterprise Credit Information Publicity System — business licence and credit code lookup — State Administration for Market Regulation, China
  5. Importing basics — entry, duty and customs procedures — US Customs and Border Protection
  6. United Nations Convention on Contracts for the International Sale of Goods (CISG) — UNCITRAL, United Nations
  7. General Administration of Customs of China — export declaration and clearance — General Administration of Customs, China

Pages related to this guide

How this guide was checked

FS

Foshan Supply editorial team · Catalogue indexMethodology

Written in Foshan and reviewed against the catalogue and public standards on 2026-11-05. This page is a buying guide, not a quotation or a warranty. How we work.

How to cite this page: Foshan Supply, “Proforma invoice: the fields that release a deposit”, 2026-11-05, https://foshansupply.com/blog/proforma-invoice-payment/