In short
- CE marking for windows is a manufacturer's declaration against EN 14351-1: it states performance, is signed, and the technical file is kept for ten years.
- The declaration is not a test report. Ask for the initial type test report naming the size, sash, glazing and hardware that were tested.
- Under AVCP System 3 a notified laboratory tests the type, but nobody audits the factory; the four-digit body number appears only with surveillance.
CE marking for windows and doors is a manufacturer's written declaration that a product's performance has been assessed against the harmonised standard EN 14351-1 and recorded in a declaration of performance. The manufacturer signs the declaration, keeps the technical file for ten years, and supplies the document with the product.
Treated as a certificate, the mark ends the conversation in the showroom. Treated as a declaration, it starts three requests: the initial type test report, the factory production control record and the destination-language declaration, with the product code on all three matching the order.
01The mark is a declaration signed by a manufacturer
The Construction Products Regulation requires a declaration of performance before a window or external doorset covered by EN 14351-1 is placed on the EU market. The declaration lists the essential characteristics the manufacturer has chosen to declare and the class or value reached for each. The CE mark is the visible end of that chain.
Four documents arrive in the same email and are routinely confused. They prove different things, and only one is signed by the party carrying the liability.
| Document | Issued by | Proves | Does not prove |
|---|---|---|---|
| CE mark | Manufacturer | A declaration exists for the type | A third party tested the value |
| Declaration of performance | Manufacturer | Declared classes, standard, AVCP system | The delivered unit matches the specimen |
| Initial type test report | Notified or accredited laboratory | A result at a stated size and configuration | Performance of another size or glazing |
| Factory production control certificate | Notified body, System 1 only | Factory control was audited | This batch was inspected |
The signature page identifies the party liable. A declaration without a signature is a draft.
Decision rule: a submittal is complete when the declaration carries a product code matching the quotation line, a date, a signature and the AVCP system. A CE logo on a brochure page is an image, not a document.
02EN 14351-1 turns performance into classes and numbers
EN 14351-1 does not grade a window. It sets out which characteristics a manufacturer may declare and which test method produces each figure, so a declaration reads as a list of tests, not a mark out of ten.
| Characteristic | Test standard | Unit or scale | RFQ clause |
|---|---|---|---|
| Air permeability | EN 12207 | Class 1 to 4 | Class not lower than 3, at the scheduled size |
| Watertightness | EN 12208 | Class 1A to 9A | Class stated against the exposure |
| Wind resistance | EN 12210 | Class 1 to 5, deflection A to C | Class and deflection limit |
| Thermal transmittance | EN ISO 10077-1 | W/(m²·K) | Uw at each scheduled size |
| Acoustic performance | EN ISO 717-1 | Rw in dB | Rw with the glazing make-up |
| Impact resistance | EN 13049 | Class 1 to 5 | Class for the lowest sill |
| Reaction to fire | EN 13501-1 | A1 to F, smoke s1 to s3 | Class required by the wall build-up |
A class records the band a specimen reached, not where inside the band. Values are declared for the tested configuration.
Two habits follow. A class is a band, not a measurement: class 4 is the highest band for air permeability under EN 12207, and two class 4 units can still leak by different amounts. And a number belongs to a specimen: a supplier who writes Uw 1.4 without the size has quoted another window.
Decision rule: require the class or value and the test standard for each opening, and reject a single figure offered for a mixed schedule.
Catalogue reference: how sourcing, inspection and documents are coordinated — models, dimensions and finishes for the directions discussed above.
03AVCP System 3 tests the type without auditing the factory
AVCP stands for assessment and verification of constancy of performance. Under EN 14351-1 most declared characteristics follow System 3: a notified laboratory carries out the initial type test, and the manufacturer runs factory production control itself. No notified body audits the line or samples output.
System 1 adds the audit and the surveillance: a notified body performs the type test, assesses factory production control, issues a certificate of constancy of performance and keeps watching the factory. EN 16034, which carries fire resistance and smoke control, uses System 1, which is why a fire doorset file is thicker than a window file.
The four-digit number printed beside the CE mark identifies the notified body involved in AVCP. In System 3 no number is affixed, because no notified body has an ongoing role. A mark without a number is not automatically wrong. A mark without a number, attached to a claim of System 1, is.
Decision rule: read the AVCP row of the declaration first, then look for the number. A number is easy to copy from another product's label.
04Ten fields in the declaration, and the ones that go missing
Annex III of the regulation lists the fields a declaration must carry. Ten is a practical number to check: the fields that go missing decide whether the document describes your window.
- Reference of the product type, and the unique identification code for it.
- Intended use, stated as windows, external pedestrian doorsets or internal doorsets.
- The manufacturer's name and address.
- The EU authorised representative, where the manufacturer is outside the Union.
- The AVCP system, by number.
- The harmonised standard, EN 14351-1.
- Declared performance for each essential characteristic.
- NPD where no performance is declared, characteristic by characteristic.
- The reference of the technical documentation.
- Date, place and signature.
The code in the first field is the one to match against the quotation and the invoice. Language is a separate obligation: the declaration must be in the language of the member state where the product is placed on the market. An English-only PDF for a site in Romania does not meet it.
NPD, no performance determined, is legal and is the quietest problem in the file. A declaration that returns NPD for watertightness and wind resistance complies while saying nothing useful. Where the project needs the value, NPD is a rejection rather than a negotiating position.
Clause to paste: declaration of performance in [language] for product code [X], AVCP system stated, notified body number where System 1 applies, and no NPD for air permeability, watertightness, wind resistance or Uw.
05The tested specimen is rarely the opening you are buying
Initial type testing happens on a specimen, and the report names its size, sash configuration, frame profile, glazing make-up and hardware. EN 14351-1 allows a result to be extended to other sizes within stated limits, but an extension is a documented argument, not permission to print the figure on every row of a schedule.
A 1.0 × 1.2 m casement has 1.2 m² and 4.4 m of perimeter. A 2.0 × 2.4 m fixed light has 4.8 m² and 8.8 m. The perimeter-to-area ratio roughly halves, and every value that depends on the frame-to-glass ratio moves with it, Uw included.
Four substitutions take a delivered unit outside the tested configuration: a different sash type, a different glazing make-up, a different frame profile or thermal break, and different hardware. Each is ordinary in a value-engineered order and expensive to discover after installation.
Decision rule: the test report must name the configuration and the size. If it says representative sample, ask what the sample represents, in writing, and keep the answer with the order.
06Doors need two standards and a set of hardware declarations
An external doorset under EN 14351-1 needs one declaration. If the leaf resists fire or smoke, EN 16034 applies alongside it, and the file becomes a set.
The set has three parts: the doorset declaration citing both standards, a classification report to EN 13501-1 with its field of application, and a declaration for every hardware item. Hardware is CE-marked under its own standards: EN 179 for emergency exit devices, EN 1125 for panic devices, EN 1154 for closers, EN 1935 for hinges and EN 12209 for locks.
A fire-rated leaf with an unrated closer is not the tested doorset: the classification belongs to the assembly, so swapping one component removes the evidence for the whole. Glazing follows the same logic: a factory-made unit is declared under EN 1279-5, and the window's Uw rests on its Ug.
Decision rule: count the documents against the tested configuration. Two product standards, one classification report and one declaration per hardware item is a complete fire doorset file; anything less is a leaf with a certificate.
07The file has to travel with the container
The declaration has to reach the site, not the showroom. A copy travels with the consignment, alongside the commercial invoice and packing list, and the importer keeps it for ten years. In practice: a PDF named by product code, a paper copy in the document pouch, and a named person at the destination.
Who signs depends on the route. An importer that sells under its own name takes on the manufacturer's obligations and issues its own declaration; a factory declaration with the importer's brand on the frame is not the importer's. A manufacturer outside the Union also needs an authorised representative established in the Union, named in the document.
Two transport documents meet the file at the container. Wood crates, pallets and dunnage carry the ISPM 15 mark applied to the wood itself, not to the packing list. A packed container needs a verified gross mass before loading under SOLAS, usually the forwarder's line rather than the supplier's. A 40HQ is nominally 76.4 m³ and practically 65 to 68 m³, so the packing list, not the nominal figure, is what the consignment is checked against.
CE marking is not a global passport. A US entry is classified under the HTS and cleared through CBP; duty depends on the code, not the mark. Timber windows entering the EU also fall under EUDR due diligence, with the application date depending on operator size and worth checking before the order is placed.
Decision rule: one declaration per product code per consignment, in the destination language, with a date and a named contact. If the importer relabels, the importer's declaration replaces the factory's.
What your RFQ should state
- Declaration of performance in the destination language, signed and dated, for the product code on the order line.
- The AVCP system stated, with the notified body number where System 1 applies.
- The initial type test report naming size, sash type, frame profile, glazing make-up and hardware.
- The declared class and standard for air permeability, watertightness, wind resistance and Uw, per opening.
- NPD only where the project does not require the characteristic, listed by name and accepted in writing.
- For fire doorsets, EN 16034 alongside EN 14351-1, plus the EN 13501-1 classification report and field of application.
- Hardware declarations for closers, hinges, locks and exit devices on the tested configuration.
- One PDF per product code with the consignment, plus a paper copy in the document pouch.
Where this guidance stops
- This is a reading guide, not legal advice. Market surveillance and language requirements vary by member state, and the importer carries the obligation at the border.
- The article does not reproduce EN 14351-1 or the Construction Products Regulation; both are amended, and the current consolidated text governs.
- A declaration cannot show workmanship. Whether the frame is square, the seal continuous and the fixings clear of the thermal break is decided on site.
- The GB position on CE marking has changed more than once. Check the current rule before labelling goods for England, Wales or Scotland.
- Foshan Supply coordinates sourcing, inspection and document collection. We do not issue declarations of performance, test products or act as a notified body; the manufacturer's signed declaration and the agreed inspection scope govern.
Questions buyers ask
Is CE marking compulsory for windows sold in the EU?
Yes. A window or external pedestrian doorset covered by the harmonised standard EN 14351-1 must be accompanied by a declaration of performance and carry the CE marking before it is placed on the EU market. The obligation sits with the manufacturer, and with an importer that places the product under its own name.
Does a CE mark mean the window was tested?
It means the manufacturer has declared performance assessed against EN 14351-1. Under System 3 a notified laboratory tests a specimen at a stated size and configuration. The delivered unit can differ in size, sash, glazing or hardware. Ask for the test report and check that its configuration matches the schedule.
What is the difference between a declaration of performance and a certificate of constancy of performance?
The declaration is issued by the manufacturer for every product covered by a harmonised standard, and it lists declared values. A certificate of constancy of performance is issued by a notified body only under System 1, after auditing factory production control and testing the type, and it comes with ongoing surveillance. System 3 produces a test report and no certificate.
Can a Chinese factory issue a CE declaration for windows?
A manufacturer outside the EU can draw up a declaration and affix the CE marking, but it must appoint an authorised representative established in the Union and name that representative in the declaration. The declaration must also be in the language of the member state of destination. The importer should verify the representative, the test laboratory and the product code before the deposit.
What does NPD mean on a declaration of performance?
NPD means no performance determined. The manufacturer has chosen not to declare that characteristic, which the regulation permits. The declaration still complies, but it gives you nothing to compare on watertightness, wind resistance or thermal transmittance. If your project needs the value, treat NPD as a failed requirement rather than a gap to fill later.
Is CE marking accepted in Great Britain?
The GB position has changed several times. CE marking has continued to be accepted for construction products in Great Britain beyond the original deadline, with UKCA as the alternative route. Check the current government guidance for the product and the destination before you print labels.
Do fire doors need CE marking?
Yes. Fire and smoke performance is declared under EN 16034, applied alongside EN 14351-1 for external doorsets or EN 14351-2 for internal doorsets. The AVCP route is System 1, so a notified body tests the type, audits the factory and issues a certificate of constancy of performance. The EN 13501-1 classification report and hardware declarations complete the file.
Sources
- Construction Products Regulation (EU) No 305/2011 — European Commission
- EN 14351-1 — Windows and doors: product standard, performance characteristics — CEN-CENELEC
- EN 16034 — Pedestrian doorsets, windows and openable windows with fire resistance and smoke control — CEN-CENELEC
- NANDO — notified bodies database — European Commission
- Regulation on deforestation-free products (EUDR) — European Commission
- ISPM 15 — Regulation of wood packaging material in international trade — International Plant Protection Convention
- Incoterms 2020 rules — International Chamber of Commerce
- Harmonized Tariff Schedule of the United States — US International Trade Commission
Pages related to this guide
How this guide was checked
- Written from the public catalogue, the standards and regulator pages listed under Sources, and the process records described on the services page.
- Catalogue references and model details were checked on 2026-11-05; 8 primary sources are linked above.
- No supplier paid for placement. No price on this page is an offer; ranges are planning references and must be confirmed in a quotation.
How these guides are researched and reviewed · Corrections policy