In short

Outdoor kitchen planning is the work of fixing the gas, water, waste and electrical services, and the access to them, before the counter, cabinet and worktop are chosen. The hob is the visible purchase; the runs behind it decide what can be built.

Most drawings start with a shape: an L, a straight run, an island with bar seating. The shape is priced and delivered, and only at installation does anyone find that the waste has no fall, the gas cylinder is sealed inside a cupboard, or the socket holds water because the cable enters from above. Each is a services decision taken by default, and each is expensive to reverse once the paving is laid.

01Four service runs decide the layout before the counter does

The counter can go anywhere that four runs can reach it: gas, cold water, waste and power. Position those first and the layout follows. Position the counter first and every run becomes a compromise.

Gas and waste are the two runs that constrain the shape. Gas needs a ventilated path and a valve you can reach without dismantling the cabinet. Waste needs a continuous fall to a gully or drain, and a rodding eye at every change of direction.

What each service needs at the counter, and what a late run rules out. Planning references for a 600 mm deep domestic counter; confirm against local code.
Service What it needs at the counter What a late run rules out Evidence to ask for
GasVentilated route; accessible isolation valveA sealed cabinet runTightness test record; competence details
Cold water15 mm supply; isolator inside the building lineA tap across a walkwayRoute drawing; isolator position
WasteContinuous fall to a gully; rodding eyeA sink below the drain inletFall in mm per metre; rodding positions
PowerProtected circuit; isolator; rated enclosureSurface conduit across a walkwayCircuit schedule; device rating; IP

A 15 mm supply suits one sink and a cold tap; two appliances at once may need more.

Decision rule: draw the four runs at 1:20 on the counter sheet. If a run must cross a walkway to reach the shape you drew, move the counter, not the pipe.

02Gas: a bottled supply changes the cabinet, not just the hob

A bottled gas supply is a housing problem before it is a cooking problem. The cylinder has to stand outside the cabinet, ventilated to open air at low level, and be changeable without moving the counter or lifting a worktop.

Liquefied petroleum gas is heavier than air. A leak in a sealed cupboard pools at the bottom, which is why the ventilation opening belongs at the lowest point of the housing. A drop-out hole in a cabinet floor is no substitute for an enclosure, and the regulator must be reachable by an adult standing at the cabinet.

A mains supply replaces the cylinder with a meter, a pipe route and an emergency control valve, and the pipe still needs a sleeve through the wall. In Great Britain, work on gas fittings must be done by a competent person under the Gas Safety (Installation and Use) Regulations 1998, and the tightness test is recorded.

RFQ clause: state the supply type, the free area of each opening in cm², the height of the low-level opening above finished ground, and who will test and certify.

Decision rule: if the cylinder housing sits inside the cabinet run without low-level ventilation to outside, the layout is wrong. Move the housing before the counter is priced.

Catalogue reference: outdoor kitchen modules and counters — models, dimensions and finishes for the directions discussed above.

03Water and waste: the fall is the one thing you cannot add later

Cold water is easy to bring to a counter. A 15 mm supply with a lockable isolator inside the building line gives a tap you can shut off without touching the cabinet, and a drain cock at the lowest point empties the pipe before the first frost.

Waste is the constraint: the trap needs a fall to a drain lower than the trap. On a terrace that drain is often a gully at the paving edge, so the sink is placed by the gully. Once the paving is laid, the only way to gain fall is to raise the counter.

Planning references for a single outdoor sink. Confirm diameter, fall and trap against the appliance data and local plumbing code.
Element Planning reference What goes wrong if it is short Clause to write
Supply pipe15 mm; full-bore isolatorWeak flow; no way to isolateDiameter; isolator position
Waste pipe40 mm; fall 1:80 to 1:100Water stands; grease setsDiameter; fall in mm per metre
TrapSeal depth in millimetresDrain smell, especially in windSeal depth; access method
Rodding eyeAt every change of directionBlockage needs the cabinet cutPosition; access panel
FrostDrain cock at the lowest pointSplit pipe in the first hard frostWinterisation procedure

A 1:80 fall is 12.5 mm per metre, a 1:100 fall is 10 mm per metre; a 4 m run needs 40–50 mm before the drain.

Decision rule: if the available fall is under 1:100 over the run, raise the counter or move the sink. Shrinking the pipe to gain slope is the wrong trade: a smaller pipe blocks sooner.

04Power: the IP rating belongs to the gland, not the box

Outdoor power is specified by enclosure rating, circuit protection and isolation point, in that order. IEC 60529 codes the enclosure in two digits: dust first, water second. IP65 is dust-tight and jet-resistant; IP67 adds temporary immersion. Neither digit describes the cable entry unless it is made off and sealed as part of the assembly.

That is where most outdoor kitchens fail. A box rated IP65 with a hand-tightened gland, or a cable entering from above, is no longer an IP65 assembly.

IP ratings under IEC 60529 and what each one does and does not cover in an outdoor kitchen
Rating Meaning Sensible position What it does not cover
IP44Splashing water; objects over 1 mmA covered wallJets, pooled water, a hose-down
IP65Dust-tight; jet-resistantAn open terrace counterImmersion, a blocked drain behind the box
IP67Dust-tight; immersion-resistantA low position where water standsLong submersion, a damaged gland

Separate parts carry no assembly rating until sealed to the maker's instruction.

RFQ clause: state the IP rating at each position, ask for it with the cable entry made off, and name the protective device and its rating in milliamps.

Decision rule: buy enclosure, gland and cable as one assembly, and reject a rating claimed for the box alone.

05The counter has to be serviced, so access is a drawing

Every connection behind an outdoor counter will be opened at least once: to change a cylinder, clear a trap, isolate a leak or drain the pipe before winter. Access is part of the design, not a favour.

  1. List every item with a connection: hob, grill, sink, tap, fridge, ice maker, socket, light, water heater.
  2. Mark every isolation point, with its height above finished ground in millimetres.
  3. Choose the access method: lift-out panel, hinged door, magnetic front or a drawer that clears the fitting.
  4. Check that the trap, the rodding eye and the regulator can be reached without moving the appliance above them.
  5. Check the clear floor space in front of each panel; a panel that opens into a walkway stays shut.
  6. Record the fixing method and the tool for each panel on the counter drawing.

Decision rule: if a panel needs a tool, the drawing states the tool, the number of fixings and the clear floor space. If it needs none, the drawing states how it stays closed in wind.

06Where the services meet the frame: stainless, aluminium and fixings

The wet end of an outdoor kitchen is a corrosion test. Chlorine from a nearby pool, salt from coastal air and standing water attack fixings and welds before they attack a frame, so the grade belongs with a maintenance regime.

Grade 304 stainless is the common choice inland. Grade 316, with molybdenum in the alloy, suits coastal salt exposure, and the difference is cheaper before fabrication than after. Powder-coated aluminium resists corrosion but chips at edges and cut-outs.

Decision rule: on a coastal site, put 316 stainless, A4 fixings and a maintenance interval in months into the first quote. Retrofitting a grade after delivery is a rebuild, not an upgrade.

07Wind, shade and the structure you are fixing to

A pergola over an outdoor kitchen is a structure, and its wind load is a calculation under EN 1991-1-4 and the local code. What matters is not the frame section in the catalogue but the substrate it is anchored to.

A slab, a timber deck and a wall give three different capacities, and a deck built for foot traffic is rarely built for uplift. On a high-rise balcony the slab weight limit and wind uplift matter as much as the look, and roof drainage must lead water away from the counter.

The order of decisions is the part that saves the project:

  1. Survey the services: where gas, water, waste and power can enter, and at what level.
  2. Fix the appliance list, because each appliance sets a connection, a clearance and an access route.
  3. Place the counter against those constraints at 1:20, with the four runs drawn in.
  4. Detail the access panels, isolation points and the fall before the cabinet is priced.
  5. Issue the RFQ with the services drawing, the appliance schedule and the substrate drawing.

Decision rule: no pergola order without the anchor calculation and the fixing schedule. A pergola sold without a substrate is a kite with a warranty.

The counter is the last decision, not the first: once the runs, the appliance list and the access are fixed, the shape has a known cost.

What your RFQ should state

  1. A services drawing at 1:20 showing the four runs, with every isolation point marked and dimensioned.
  2. The gas supply type, the free area of each ventilation opening in cm², its height above finished ground, and who will test and certify.
  3. Cold water pipe diameter, isolator position, drain-down point and the frost protection method.
  4. Waste pipe diameter, fall in mm per metre, trap seal depth and the position of every rodding eye.
  5. The IP rating at each position, stated for the enclosure and gland as an assembly, with the device rating in milliamps.
  6. A service access drawing naming each panel, its fixing method, the tool required and the clear floor space in millimetres.
  7. The stainless grade for frame and worktop, the fixing grade, and the maintenance interval in months for a coastal site.
  8. The substrate drawing for any pergola, with the anchor calculation reference and the drainage route.

Where this guidance stops

Questions buyers ask

What is the first decision in outdoor kitchen planning?

The service runs. Fix where gas, cold water, waste and power can enter, and at what level, before you draw the counter. The waste fall is usually the tightest constraint, because it depends on the drain level. A layout drawn before that survey is a shape looking for a drain.

Can an outdoor kitchen run on bottled gas?

Yes, with a cylinder housing ventilated to open air at low level, a regulator and changeover valve you can reach, and a competent person to test and certify. Liquefied petroleum gas is heavier than air, so a sealed cupboard is a hazard rather than a store. Put the housing on the drawing.

How much fall does an outdoor sink waste need?

A fall of 1:80 to 1:100 is the usual planning reference, which is 12.5 mm to 10 mm per metre. A 4 m run therefore needs 40 mm to 50 mm of fall before it enters the drain. If the site cannot give you that, raise the counter or move the sink; do not shrink the pipe.

What IP rating do outdoor kitchen sockets need?

Match the rating to the position, not to the product name. IP65 is dust-tight and jet-resistant, which suits an open terrace counter. IP67 adds temporary immersion for a low position where water stands. The rating only holds if the gland is made off correctly, so specify enclosure and gland as one assembly.

How do I stop outdoor kitchen pipes freezing?

Give the run a drain cock at its lowest point, an isolator inside the building line, and a written winterisation procedure that says who drains it and when. Insulation slows heat loss but does not empty a pipe. A split usually happens at a joint that held water after the tap was closed.

Can a pergola be fixed to a timber deck?

It can, if the deck and its fixings have been checked for uplift and the anchor calculation covers that substrate. A deck designed for foot traffic is not automatically designed for a roof in wind. Ask for the calculation under EN 1991-1-4 and the fixing schedule before the pergola is ordered.

What should I send a supplier for an outdoor kitchen quote?

Send the four service entry points with levels, the appliance list with model numbers, the counter dimensions and the substrate drawing for any structure. Add photographs of the site and the destination market. A quote built without them cannot be compared with another supplier's, because each will assume a different layout.

Sources

  1. EN 581 — Outdoor furniture: seating and tables for domestic, contract and public use — European Committee for Standardization
  2. IEC 60529 — Degrees of protection provided by enclosures (IP code) — International Electrotechnical Commission
  3. ISO 105-B02 — Textiles: tests for colour fastness to artificial light — International Organization for Standardization
  4. EN 1991-1-4 — Eurocode 1: actions on structures, wind actions — European Commission Joint Research Centre
  5. Gas safety in the home — the Gas Safety (Installation and Use) Regulations 1998 — UK Health and Safety Executive
  6. The Water Supply (Water Fittings) Regulations 1999 — UK National Archives
  7. Water fittings and materials approval — Water Regulations Advisory Scheme

Pages related to this guide

How this guide was checked

FS

Foshan Supply editorial team · Catalogue indexMethodology

Written in Foshan and reviewed against the catalogue and public standards on 2026-11-05. This page is a buying guide, not a quotation or a warranty. How we work.

How to cite this page: Foshan Supply, “Outdoor kitchen planning: services before shapes”, 2026-11-05, https://foshansupply.com/blog/outdoor-kitchen-planning/